瓶胚吹瓶機:Preform Blow Molding Machine
瓶胚吹瓶機:Preform Blow Molding Machine
Preform Blow Molding Machine (ISBM/RSBM) Standard Operating Procedures (SOP)
I. Pre-Startup Preparation (Critical for Safety & Product Quality)
1. Equipment Inspection
- Mechanical System: Check the mold clamping mechanism, guide rails, and stretch rod for debris, wear, or looseness, ensuring the stretch rod operates smoothly (use food-grade lubricant for food packaging applications); clean residual plastic and dust from the mold cavity, and inspect the mold for cracks and surface damage; verify that the feeding conveyor, orientation mechanism, and demolding system are properly aligned, and test manually to ensure no jamming.
- Electrical System: Confirm stable power supply and good grounding, normal display of the control panel (HMI), and intact buttons and indicators; check wiring harnesses, connectors, and sensors (temperature/pressure/position) for no damage or looseness, and ensure the emergency stop button responds sensitively.
- Pneumatic & Hydraulic Systems: Check the air compressor pressure (0.6-0.8MPa), and use soapy water to detect no air leakage in air pipes, valves, and cylinders; for hydraulic clamping systems, verify normal oil level and temperature, and no leakage in hydraulic pipelines.
- Cooling System: Ensure sufficient liquid level in the cooling water tank and normal operation of the water pump, with no blockage in cooling pipelines; set the cooling water temperature (15-25℃ for PET containers) and verify that the flow rate meets requirements.
2. Material Preparation
- PET Preforms: Moisture content ≤0.02% (dried at 140-160℃ for 4-6 hours to prevent hydrolysis); free of scratches, deformation, uneven wall thickness, and other defects, with intact neck threads; the hopper loading capacity shall not exceed 80% to avoid jamming in the feeding system.
- Auxiliary Materials: Prepare high-pressure air filtered to remove oil and water, and confirm the normal operation of the air dryer.
3. Mold Installation & Calibration
II. Startup & Parameter Setting (Step-by-Step Calibration)
1. Power-On & System Initialization
2. Heating Tunnel Preheating
3. Core Parameter Configuration (Critical for Finished Product Quality)
|
Parameter Category
|
Specific Settings
|
Reference Range for PET Containers
|
|
Heating Parameters
|
Temperature of Zones 1-5, Preform Residence Time
|
70-90℃; 8-15 seconds (extended for thick preforms)
|
|
Stretching Parameters
|
Stretch Rod Speed, Stretch Stroke
|
50-150mm/s; Finished Product Height - Preform Height
|
|
Blow Molding Parameters
|
Primary Blowing Pressure, Secondary Blowing Pressure, Blowing Time
|
0.8-1.5MPa; 3-4MPa; 1.5-3 seconds
|
|
Cooling & Cycle
|
Mold Cooling Time, Total Cycle Time
|
2-5 seconds (extended for large-capacity products); 3-10 seconds
|